JUMPMON

Returns date that is the number of months after the month of the date passed.

Reporting Area(s):

General

Required Parameters:

  1. Date field (i.e. rgaddate, cobegdate, date() )
  2. Numeric return value: number of months to add to date field (i.e. 3- returns date 3 months after date field entry)

Optional Parameters:

None

Example(s):

JUMPMON(rgaddate,3) returns date that is three months after date registration is added to system (e.g if rgaddate is 01/02/2015, returns 04/02/2015)

Notes:

Use to determine the completion date of an independent study course

 

Related Topics Link IconRelated Topics